Search

Click to sort the table by: ID name area description cost mode
ID Title Location Description Cost Modes
20007 South Portal Intersection Improvements Central City Improve the South Portal to the North Macadam District (intersection of Bancroft, Hood, and Macadam) to address safety and capacity issues. Includes new extension of Lowell St. $8,138,078 Traffic/Freight
30008 Columbia Blvd Smart Cities Corridor ITS Improvements Central Northeast Neighborhoods Install Intelligent Traffic Systems (ITS) infrastructure, including closed circuit TV cameras, truck priority detection, variable message signs for remote monitoring and control of traffic flow for six signals. $5,000,000 Traffic/Freight
30070 St Johns Truck Strategy, Phase 2 North Portland Neighborhood Services Construct pedestrian crossing safety and traffic calming improvements, such as curb extensions and median islands, and redesign the Columbia/Portland intersection as outlined in the St Johns Truck Strategy Phase II. $4,000,000 Active
30088 N Portland Greenway Trail, Segment 2 North Portland Neighborhood Services Build a multi-use trail connecting Chimney Park, Pier Park, Baltimore Woods, Cathedral Park, and St Johns. $3,500,000 Active
40116 NE 7th/9th Neighborhood Greenway Northeast Coalition of Neighborhoods Construct a neighborhood greenway along the NE 7th/9th Ave corridor from Weidler to Holman (alignment to be determined during design phase), using appropriate traffic calming treatments. $2,000,000 Active
50028 Outer Halsey Ped/Bike Improvements East Portland Neighborhood Office Construct missing sidewalks, enhance existing bike lanes, add and improve pedestrian/bicycle crossings. $2,500,000 Active
50047 HOP Neighborhood Greenway East Portland Neighborhood Office Design and implement a neighborhood greenway. Project includes crossing improvements at 102nd and 122nd and paving of gravel streets at Oregon (110th - 111th) and Holladay (118th - 119th). $1,864,000 Active
60027 Con-way Access Improvements Neighbors West/Northwest Extend 20th Ave under Hwy 30 and redesign connections to Thurman, including pedestrian and bicycle facilities. Realign the intersection of NW 23rd & Vaughn to improve traffic flow and circulation. $7,500,000 Traffic/Freight
60030 NW/SW 20th Ave Neighborhood Greenway Neighbors West/Northwest Design and implement a neighborhood greenway, with traffic calming and improved crossings as needed. $500,000 Active
90016 SW Barbur Corridor Improvements Southwest Neighborhoods, Inc. Improve safety on SW Barbur by adding enhanced bicycle facilities, including intersection safety improvements at Capitol Highway. $3,950,000 Active
90020 Hillsdale Town Center Pedestrian Connections Southwest Neighborhoods, Inc. Construct sidewalk infill on SW Beaverton-Hillsdale Highway and on Dosch from BeavertonHillsdale Highway to Flower (1 block.) $3,000,000 Active
90111 Red Electric Trail, Segment 4 Southwest Neighborhoods, Inc. Construct segment 4 of the Red Electric Trail, including ped/bike bridge from B-H Hwy to Capitol Hwy. $3,900,000 Active
20073, 40058, 20174 (CC), 20175 (CC), 20182 (CC) Grand/MLK Central Eastside Access and Circulation Central City Construct new traffic signals, modify existing signals, and improve bicycle routes to improve access and circulation for all modes. $4,000,000 Traffic/Freight
20193.1 (CC) Post Office Blocks Transportation Improvements, Phase 1 Central City Extend Johnson and Park Streets through the Post Office Blocks redevelopment site. Add traffic signals at 9th/Everett and 9th/Glisan. $5,000,000 Active
40013, 70072 Jade & Montavilla Connected Centers Project East Portland Neighborhood Office Construct multi-modal corridor connections on key pedestrian and bicycle routes within and connecting to the Jade District and Montavilla Neighborhood Centers. $7,200,000 Active
40086.1, 40086.2, 80033 NE Halsey Safety and Access to Transit Central Northeast Neighborhoods Construct pedestrian crossings and missing sidewalks. Improve existing path under Halsey overpass west of MAX station and add neighborhood greenway connection to Tillamook. Improve signals and neighborhood greenway on Holladay from 80th to 87th. $5,000,000 Active
40119, 40020 Sullivan's Gulch Trail, Segment 6 Central Northeast Neighborhoods Construct missing sidewalks and bike lanes on 92nd from Tillamook to Halsey. Construct multi-use path along Halsey frontage road, underneath I-205, and connecting to I-205 Path in Gateway Green. $3,591,000 Active
70075, 10005 Brentwood-Darlington Safe Routes to School Southeast Uplift Construct missing sidewalks behind existing curb on Duke and Flavel. Implement traffic calming and additional pedestrian crossings on Knapp and Ogden, with traffic calming and crossing improvements. Build pedestrian/bicycle connection to Springwater Corridor on 87th Ave south of Flavel. $5,350,000 Active
80014, 80020 David Douglas Safe Routes To School East Portland Neighborhood Office Construct missing sidewalks on Mill Street and on 130th, and bicycle facilities on SE Mill/Main. $8,000,600 Active
10005 NE 112th & Marx Sidewalk Infill East Portland Neighborhood Office Construct sidewalk infill around the intersection of NE 112th & Marx. $1,000,000 Active
10014 Division-Midway Local Street Improvements East Portland Neighborhood Office Local street improvements. $3,000,000 Traffic/Freight
10014 Cully Street Local Street Improvements Central Northeast Neighborhoods Local street improvements. $2,000,000 Traffic/Freight
10014 Tryon-Stephens Local Street Improvements Southwest Neighborhoods, Inc. Local street improvements. $2,000,000 Traffic/Freight
20002 I-405 Corridor ITS Central City ITS improvements at six signals between Clay and Glisan including communications infrastructure; closed circuit TV cameras, variable message signs for remote monitoring and control of traffic flow. $10,000,000 Traffic/Freight
20057 Willamette Greenway Trail Central City Provide two paths in order to separate bicyclists from pedestrians in remaining gaps of South Waterfront's Willamette Greenway trail. $2,500,000 Active
20107 SW 4th Ave Corridor Improvements Central City Add bicycle facilities, enhanced pedestrian crossings, and traffic signals. $2,500,000 Active
20108 SW Broadway Bikeway and Streetscape Improvements Central City Construct a raised bikeway, sidewalk amenities, green street features, disabled pedestrian access requirements, pedestrian islands, curb bulb-outs, and a full signal at Harrison. Add safety features on the existing bikeway on SW Broadway. $1,500,000 Active
20112 NE Multnomah Protected Bikeway Central City Construct permanent improvements to the protected bikeway. $2,000,000 Active
20113 Broadway/Weidler Corridor Improvements, Phase 1 Central City Enhance existing bike lanes and improve pedestrian/bicycle crossings. Add traffic signals, improve signal timing, improve transit stops, and construct streetscape improvements. $9,000,000 Active
20115 Central City Multimodal Improvements, Phase 2 Central City Construct high-priority bikeways, pedestrian improvements, and transit priority treatments in the Central City. $20,000,000 Active
20127 Better Naito Walkway / Bikeway Central City Design and implement a separated two-way walkway and bikeway on the east side of Naito Parkway. $3,700,000 Active
20187 Water/Yamhill Traffic Signal. Central City Construct traffic signal at Water/Yamhill. $500,000 Traffic/Freight
20188 Grand/MLK Lloyd District Traffic Signals Central City Construct traffic signals along Grand/MLK couplet in the Lloyd District. $1,000,000 Traffic/Freight
30014 Failing St Neighborhood Greenway Northeast Coalition of Neighborhoods Construct a bikeway using neighborhood greenway and/or separated in-roadway treatments, with crossing modifications as needed. $1,000,000 Active
30015 Going St Connected/Automated Vehicle Connection North Portland Neighborhood Services Design and construct a Connected/Automated Vehicle connection between Swan Island and I-5. $10,000,000 Traffic/Freight
30037 N Lombard Corridor Improvements North Portland Neighborhood Services Construct transportation and streetscape facilities to improve safety and promote pedestrian-oriented uses along the corridor and to create a safe, pleasant pedestrian link over I-5  $5,000,000 Active
30038 Marine Dr ITS North Portland Neighborhood Services Construct Intelligent Transportation Systems (ITS) infrastructure, including communication network, enhanced bus detection, Bluetooth detection, cameras, and vehicle /pedestrian detectors. $1,500,000 Traffic/Freight
30050 St Johns Pedestrian Improvements North Portland Neighborhood Services Construct pedestrian connections for access to transit and improved safety. Add lighting and crossings, realign the "ivy" island, curb extensions, a new traffic signal at Richmond/Lombard, and pedestrian connections between St. Johns and the riverfront. $5,000,000 Active
30059 N Lombard Main Street Improvements North Portland Neighborhood Services Implement main street improvements along N Lombard consistent with the St Johns/Lombard Plan, including curb extensions and street lighting. Create a continuous bikeway using a combination of in-roadway bike lanes and parallel neighborhood greenways. $2,000,000 Active
30081 Argyle Complete Street North Portland Neighborhood Services Design and implement pedestrian and bicycle facilities on N Argyle from N Columbia Blvd to N Denver Ave. Construct safety and connectivity improvements at the Columbia, Brandon, and Denver intersections.  $2,145,000 Active
30110 N Willamette Blvd Bikeway North Portland Neighborhood Services Design and implement a neighborhood greenway from Interstate to Rosa Parks, enhance existing bikeway from Rosa Parks to Woolsey, provide a neighborhood greenway on Yale and Amherst, and extend bikeway to Richmond. $5,000,000 Active
40006 Marine Dr & 33rd Intersection Improvements Central Northeast Neighborhoods Signalize intersection to improve freight operations. $1,000,000 Traffic/Freight
40007 NE 42nd/47th Ave Bridge & Corridor Improvements Central Northeast Neighborhoods Replace the weight-restricted NE 42nd Ave Bridge (#075) over NE Portland Hwy and the adjacent railway, and add pedestrian and bicycle facilities to the bridge and the roadway from Killingsworth to Columbia. $10,000,000 Active
40013 82nd Ave Corridor Improvements Central Northeast Neighborhoods Construct sidewalks, pedestrian crossings, transit stops, striping, and signals to enhance ped/bike safety, access to transit. Project design will consider freight movement needs. $5,000,000 Active
40027 Alderwood Path Central Northeast Neighborhoods Construct a multi-use path on the west side of Alderwood. $2,500,000 Active
40036 Cornfoot Rd Corridor Improvements Central Northeast Neighborhoods Construct a multi-use path on the north side of Cornfoot Rd and install missing guardrail segments on the south side. $3,708,539 Active
40037 Cully Blvd Corridor Improvements, Phase 2 (Prescott - Fremont) Central Northeast Neighborhoods Sidewalk infill, enhanced bikeway, and crossing improvements. $2,000,000 Active
40037 Cully Blvd Corridor Improvements, Phase 3 (Columbia - Portland Hwy) Central Northeast Neighborhoods Construct pedestrian and bicycle facilities, including new curb and drainage. $5,000,000 Active
40053 NE Killingworth Safety Improvements Northeast Coalition of Neighborhoods Design and implement traffic calming and pedestrian crossing improvements. $900,000 Active
40058 Grand/MLK ITS Northeast Coalition of Neighborhoods Install ITS infrastructure (communication network, enhanced bus detection, Bluetooth detection, CCTV cameras, and vehicle /pedestrian detectors). $1,000,000 Traffic/Freight
40065 NE Prescott Safety Improvements Central Northeast Neighborhoods Build bicycle facilities, sidewalks, and pedestrian crossings for access to transit. $2,000,000 Active
40068 Sandy Blvd Corridor Improvements, Phase 2 Central Northeast Neighborhoods Construct bicycle facilities, improve pedestrian crossings, and make streetscape improvements. $6,500,000 Active
40069 Sandy Blvd ITS Central Northeast Neighborhoods Install ITS infrastructure (communication network, enhanced bus detection, Bluetooth detection, CCTV cameras, and vehicle /pedestrian detectors). These ITS devices allow us to provide more efficient and safe operation of our traffic signal system consistent with our policies of moving people more effectively. $2,000,000 Traffic/Freight
40071 Mason Neighborhood Greenway Central Northeast Neighborhoods Design and implement a bikeway using neighborhood greenway and/or separated in-roadway treatments, with crossing improvements as needed. $2,000,000 Active
40091 Portland International Center Ped/Bike Improvements Central Northeast Neighborhoods Construct bicycle and pedestrian facilities as shown in the PDX Bicycle and Pedestrian Master Plan. $1,000,000 Active
40107 Outer Alberta Neighborhood Greenway Central Northeast Neighborhoods Design and implement a neighborhood greenway, including connection through or around Sacajawea Park and connection north to Cully Park. $5,000,000 Active
40111 NE Simpson St Neighborhood Greenway Central Northeast Neighborhoods Design and implement a neighborhood greenway. $1,000,000 Active
40112 Columbia & Cully Intersection Improvements Central Northeast Neighborhoods Construct northbound right turn lane on NE Cully and signalize the intersection of NE Cully Blvd & NE Columbia Blvd. Construct pedestrian and bicycle facilities around intersection. $2,000,000 Traffic/Freight
40112 Columbia/Cully Intersection Improvements Central Northeast Neighborhoods Construct northbound right turn lane on NE Cully and signalize the intersection along with pedestrian and bicycle facilities around intersection. $5,000,000 Traffic/Freight
40114 Columbia Slough Trail Gap North Portland Neighborhood Services Construct a multi-use path. $1,000,000 Active
40115 60th MAX Station Area Improvements Central Northeast Neighborhoods Build a neighborhood greenway from Sacramento to Davis, with additional neighborhood greenway connections east and west. Widen sidewalk and make pedestrian crossing improvements on 60th Ave. Adjust traffic signal and pedestrian crossings on Halsey. $4,000,000 Active
40118.2 Sullivan's Gulch Trail, Segment 4 Central Northeast Neighborhoods Construct a multi-use trail for pedestrians and bicycles along Broadway and Jonesmore adjacent to the I-84 sound wall, with an improved crossing of 74th Ave. Provide neighborhood greenway bikeway connections west and east. $2,000,000 Active
50003 SE 102nd Ave Multimodal Improvements East Portland Neighborhood Office Bike lanes, pedestrian crossings, and transit improvements along 102nd Ave in Gateway Regional Center. $1,000,000 Active
50004 NE 102nd Ave Corridor Improvements East Portland Neighborhood Office Construct sidewalks and improved crossings, install bicycle facilities, and make traffic safety improvements. $2,000,000 Active
50005 122nd Ave ITS East Portland Neighborhood Office Install needed ITS infrastructure (communication network, new traffic controllers, CCTV cameras, and vehicle /pedestrian detectors). These ITS devices allow us to provide more efficient and safe operation of our traffic signal system. $6,000,000 Traffic/Freight
50009 NE 148th Ave Safety Improvements East Portland Neighborhood Office Design and implement pedestrian and bicycle facilities, including intersection crossing improvements at 148th & Sandy. Improve traffic safety by addressing line of sight issues just north of I-84. $10,000,000 Active
50016 Airport Way ITS East Portland Neighborhood Office Install needed ITS infrastructure (communication network, new traffic controllers, CCTV cameras, and vehicle /pedestrian detectors). These ITS devices allow us to provide more efficient and safe operation of our traffic signal system. $1,500,000 Traffic/Freight
50019 Gateway Local Street Improvements, Phase 1 East Portland Neighborhood Office High priority local street and pedestrian improvements in regional center. $8,400,000 Traffic/Freight
50024 Gateway--Glisan Streetscape Improvements East Portland Neighborhood Office Implement Gateway regional center plan with boulevard design retrofit, new traffic signals, bike facilities, improved pedestrian facilities and crossings, and street lighting. $3,250,000 Active
50025 Outer Glisan Safety and Streetscape Improvements East Portland Neighborhood Office Install bicycle facilities on existing street. Install traffic signals and pedestrian crossings. $3,100,241 Active
50037 San Rafael/Tillamook Neighborhood Greenway East Portland Neighborhood Office Design and implement a neighborhood greenway, with improved crossings at major streets. $1,750,000 Active
50041 Marine Dr Trail Gap East Portland Neighborhood Office Construct a multi-use path along the north side of Marine Dr. $1,000,000 Active
50044 I-84 Path Extension and Parkrose Neighborhood Greenway East Portland Neighborhood Office Construct a neighborhood greenway, including a multi-use path and bridge from the I-205 Path to NE Fremont St and a sidepath along the south side of NE Fremont St connecting to I-84 Path. $5,000,000 Active
50045 Woodland Park Neighborhood Greenway East Portland Neighborhood Office Neighborhood greenway connection from Gateway Transit Center to 100s Neighborhood Greenway. $1,000,000 Active
50046 Knott/Russell Neighborhood Greenway East Portland Neighborhood Office Design and implement a neighborhood greenway. Project includes crossing improvements at 102nd, 122nd, and 148th. $1,000,000 Active
50049 122nd Ave Corridor Improvements East Portland Neighborhood Office Build sidewalks, pedestrian crossings, bicycle facilities, transit stops, and traffic signals. $8,000,000 Active
50053 NE 148th Ave Sidewalk Infill East Portland Neighborhood Office Construct sidewalk infill on the west side of the street. $3,000,000 Active
60023 Yeon/St Helens ITS Neighbors West/Northwest Install needed ITS infrastructure (communication network, new traffic controllers, CCTV cameras, and vehicle /pedestrian detectors). $850,000 Traffic/Freight
60024 Wildwood Trail Bridge Neighbors West/Northwest Construct a pedestrian overcrossing or signalized at-grade pedestrian crossing where Burnside intersects the Wildwood Trail. $2,000,000 Active
60031 W Burnside & Skyline Intersection Improvements Neighbors West/Northwest Construct intersection improvements at both legs of the double intersection to improve safety for all modes. $1,850,000 Active
70008 SE 92nd Ave Bikeway East Portland Neighborhood Office Construct bicycle facilities. $1,000,000 Active
70010 Inner E Burnside Ped/Bike Improvements Southeast Uplift Add new and enhance existing bicycle facilities and improve pedestrian crossings to provide safe access to schools and transit. $5,000,000 Active
70017 Ellis Ped/Bike Improvements East Portland Neighborhood Office Construct pedestrian and bicycle facilities. $2,500,000 Active
70020 SE Flavel St Sidewalk Infill East Portland Neighborhood Office Construct sidewalk infill. $1,250,000 Active
70021 Foster Rd Corridor Improvements, Phase 2 Southeast Uplift Construct remaining elements from the Foster Rd Transportation and Streetscape Plan, including curb extensions along the corridor and roadway widening at 82nd/Foster in order to extend bike lanes through intersection. $2,000,000 Active
70034 I-205 Multi-use Path Crossings East Portland Neighborhood Office Improve crossings and access to I-205 multi-use path at Glisan, Stark/Washington, and other intersections as needed. $1,000,000 Active
70049 Reedway Ped/Bike Overcrossing Southeast Uplift Construct a pedestrian/bicycle overcrossing of McLoughlin Blvd, light rail, and railroad tracks. $5,000,000 Active
70053 Springwater Gap Trail Southeast Uplift Construct trail-with-rail multi-use path between Linn and 19th to fill in the "Springwater Gap." $2,000,000 Active
70057 Tacoma St ITS Southeast Uplift Communications infrastructure; closed circuit TV cameras, variable message signs for remote monitoring and control of traffic flow for four signals. $250,000 Traffic/Freight
70071 Sixties Neighborhood Greenway Southeast Uplift Construct a neighborhood greenway. $1,500,000 Active
70073 SE 34th Ave Neighborhood Greenway Southeast Uplift Design and implement bicycle facilities. $540,000 Active
70077 SE 9th/Center Bikeway Southeast Uplift Construct a neighborhood greenway on 9th Ave and Center St, with separated bicycle facility segments and crossing improvements as needed. $500,000 Active
70081 SE 21st Ave Bikeway Southeast Uplift Build bicycle facilities. $500,000 Active
80001 SE 112th Ave Ped/Bike Improvements East Portland Neighborhood Office Construct missing sidewalks and add bike lanes. $2,000,000 Active
80005 SE 148th Ave Pedestrian Improvements East Portland Neighborhood Office Construct sidewalks, curbs, and drainage improvements. $2,000,000 Active
80012 Outer Holgate Ped/Bike Improvements East Portland Neighborhood Office Build multi-modal corridor connections. Construct sidewalks and crossing improvements to facilitate pedestrian travel and access to transit. Extend bicycle facilities from 130th to 136th. $3,000,000 Active
80014 Mill Park Pedestrian Improvements East Portland Neighborhood Office Construct missing sidewalks on 101st and 117th. $5,000,000 Active
80016 Powellhurst/Gilbert Pedestrian Improvements East Portland Neighborhood Office Construct separated and curb tight sidewalk infill and other related pedestrians improvements in the Powellhurst Gilbert Neighborhood. $5,000,000 Active
80017 Outer Stark Ped/Bike Improvements East Portland Neighborhood Office Construct sidewalks and crossing improvements and provide bicycle facilities. $4,000,000 Active
80018 Stark/Washington Multimodal Improvements East Portland Neighborhood Office Build protected bike lanes, pedestrian crossings, and transit improvements along the Stark/Washington couplet in Gateway Regional Center. $2,000,000 Active
80035 100s Neighborhood Greenway East Portland Neighborhood Office Design and implement a neighborhood greenway. $1,672,500 Active
80035 150s Neighborhood Greenway East Portland Neighborhood Office Design and implement a neighborhood greenway. $1,500,400 Active
90002 SW 19th / Capitol Hill Rd Safety Improvements Southwest Neighborhoods, Inc. Construct multi-modal corridor connections with bicycle and pedestrian facilities to create a safe and convenient crossing of I-5, Multnomah Blvd, and Barbur Blvd. Build enhanced shared roadway bicycle facilities on Capitol Hill Rd. $1,000,000 Active
90008.2 SW 45th Ave Ped/Bike Improvements, Segment 2 Southwest Neighborhoods, Inc. Construct a pedestrian walkway and bicycle facilities. $1,000,000 Active
90011 SW Pomona/64th Ped/Bike Improvements Southwest Neighborhoods, Inc. Construct sidewalks and bicycle facilities. $2,500,000 Active
90014 Barbur Blvd ITS Southwest Neighborhoods, Inc. Install Intelligent Transportation Systems (ITS) infrastructure, including communication network, new traffic controllers, cameras, and vehicle /pedestrian detector to improve safety and improve traffic flow. $1,500,000 Traffic/Freight
90019 Beaverton-Hillsdale Hwy ITS Southwest Neighborhoods, Inc. Install needed ITS infrastructure (communication network, new traffic controllers, CCTV cameras, and vehicle /pedestrian detectors). These ITS devices allow us to provide more efficient and safe operation of our traffic signal system. $500,000 Traffic/Freight
90020 Beaverton-Hillsdale Hwy Corridor Improvements Southwest Neighborhoods, Inc. Enhance existing bikeways, build new sidewalks, improve crossings, and enhance access to transit. $3,000,000 Active
90034.1 Bridlemile Ped/Bike Improvements, Phase 1 Southwest Neighborhoods, Inc. Construct a pedestrian walkway, bicycle facilities, and crossing improvements. $4,000,000 Active
90046 Macadam ITS Southwest Neighborhoods, Inc. Install needed ITS infrastructure (communication network, new traffic controllers, CCTV cameras, and vehicle /pedestrian detectors). $400,000 Traffic/Freight
90050 SW Multnomah Blvd Ped/Bike Improvements, Phase 2 Southwest Neighborhoods, Inc. Provide separated pedestrian and bicycle facilities, along with stormwater management facilities. $1,000,000 Active
90052 SW Palatine Hill / Primrose Bikeway Southwest Neighborhoods, Inc. Design and implement a bikeway from Terwilliger to Palater, including improved crossings at Primrose & Terwilliger and Primrose & Boones Ferry. $2,000,000 Active
90054.3 SW Patton / Talbot Ped/Bike Improvements Southwest Neighborhoods, Inc. Construct a pedestrian walkway and bicycle facilities, with improved crossings where needed. $500,000 Active
90059.1 SW Shattuck Rd Ped/Bike Improvements, Segment 1 Southwest Neighborhoods, Inc. Construct a pedestrian walkway, climbing bike lane, and crossing improvements. $1,000,000 Active
90061 SW Spring Garden St Ped/Bike Improvements Southwest Neighborhoods, Inc. Design and implement pedestrian and bicycle facilities, including improved crossings at 22nd & Barbur and 22nd & Multnomah. $2,500,000 Active
90062 SW Stephenson Ped/Bike Improvements Southwest Neighborhoods, Inc. Construct pedestrian and bicycle facilities. $2,500,000 Active
90064.1 Outer Taylors Ferry Safety Improvements, Segment 1 Southwest Neighborhoods, Inc. Widen shoulder to provide bicycle climbing lane and construct a walkway for pedestrian travel and access to transit. $2,175,000 Active
90065.2 Inner Taylors Ferry Safety Improvements, Segment 2 Southwest Neighborhoods, Inc. Widen shoulder to provide bicycle climbing lane and construct a walkway for pedestrian travel and access to transit. $1,883,009 Active
90070 Capitol/Vermont/30th Intersection Improvements Southwest Neighborhoods, Inc. Realign the intersection and provide sidewalks, bike lanes, and drainage improvements. $2,000,000 Active
90073 SW Dolph Ct Ped/Bike Improvements Southwest Neighborhoods, Inc. Construct a neighborhood greenway. Connect missing sidewalk gap on north side of SW Dolph Ct. from Spring Garden Park to SW 30th Ave., where existing sidewalk connects to frequent transit service on SW Barbur Blvd. $2,750,000 Active
90086 Slavin Rd Ped/Bike Improvements Southwest Neighborhoods, Inc. Build a pedestrian and bicycle connection on Slavin Road connecting Barbur to Corbett, and construct an improved pedestrian/bicycle crossing of Barbur at the Capitol Hwy on-ramp. $2,000,000 Active
90087 Hood Ave Pedestrian Improvements Southwest Neighborhoods, Inc. Install sidewalk with barrier along east side of Hood Ave and pedestrian crossing at Lane Street. $1,000,000 Active
90091 Terwilliger Bikeway Gaps Southwest Neighborhoods, Inc. Design and implement bicycle facilities to fill in gaps in the Terwilliger Bikeway. $1,000,000 Active
90092 Inner Canby Neighborhood Greenway Southwest Neighborhoods, Inc. Design and implement bicycle facilities, including a multi-use path around Gabriel Park. $500,000 Active
90095.1 Montgomery Bikeway, Phase 1 Southwest Neighborhoods, Inc. Design and implement bicycle facilities. $300,000 Active
90100 SW 30th/Hume/31st Ped/Bike Improvements Southwest Neighborhoods, Inc. Construct a pedestrian walkway and bicycle facilities. $2,800,000 Active
90108 Red Electric Trail, Segment 1 Southwest Neighborhoods, Inc. Construct Segment 1 of the Red Electric Trail - pedestrian and cyclist only structure connecting Bertha Boulevard to Capital Highway. $2,000,000 Active
20050 (CC) Southern Triangle Access Improvements Central City Improve traffic access to the Southern Triangle district from eastbound Powell Blvd. $4,000,000 Traffic/Freight
20125 (CC) Portland Streetcar Operational Improvements Central City Design and construct improvements along NE Grand Avenue and/or other shared Streetcar/Bus corridors to add transit capacity. Capital improvements could include signal pre-emption, additional travel lanes, additional track, tail track, and OCS, creation of transit only lanes, and other capital improvements to reliably move public transit past motor vehicle/freeway on-ramp bottlenecks. $5,000,000 Transit
20146 (CC) NW 18th/19th/Alder Bikeway Central City Construct separated bike lanes to extend the 18th/19th Bikeway and connect to Alder. Provide bike lanes in both directions along Alder from 18th to 14th, and add bike lanes on the Alder/Washington couplet from 14th to Broadway. $3,000,000 Active
20164 (CC), 20165 (CC) Pearl District Traffic Signals Central City Construct traffic signals at 9th & Everett, 9th & Glisan, and along Northrup from 11th to 16th to improve traffic flow and transit operations. $2,000,000 Traffic/Freight
20181 (CC) Hawthorne Multimodal Corridor Improvements Central City Signalize the top of the ramp from SW Naito to Hawthorne Bridge to improve safety and capacity for all modes.Construct an eastbound protected bikeway with transit islands to improve pedestrian and bicycle safety and comfort as well as transit operational efficiency. $2,600,000 Active
20185 (CC) Gideon Street Pedestrian / Bicycle Bridge Central City Construct a pedestrian / bicycle bridge over the railroad and light rail tracks to connect the Clinton MAX Station with the adjacent neighborhood. $10,000,000 Active
20189 (CC), 20190 (CC) Lloyd District Turnbacks and Streetcar Vehicle Acquisition Central City Finalize design and construct turnbacks in the Lloyd District and procure additional streetcar vehicles to increase service capacity and frequency. $11,000,000 Transit
90067.1, 90067.2 SW Vermont Ped/Bike Improvements Southwest Neighborhoods, Inc. Construct multi-modal street improvements including bicycle and pedestrian facilities. $2,000,000 Active
10010 East Portland Enhanced Transit East Portland Neighborhood Office Improve transit speed, reliability, safety, and access along one or more major transit corridors in East Portland, to be determined through the Enhanced Transit Corridors Plan. TBD Transit
10010 Inner Ring Enhanced Transit Northeast Coalition, Southeast Uplift Improve transit speed, reliability, safety, and access along one or more major transit corridors in the Inner Ring of Portland, to be determined through the Enhanced Transit Corridors Plan. TBD Transit
40131 Streetcar extension Northeast Coalition, Central City, Neighbors West/Northwest TBD TBD Transit
70015 SE Division St Transit Improvements, Phase 2 East Portland Neighborhood Office, Southeast Uplift, Central City Provide capital improvements that benefit frequent bus service. TBD Transit
90060 South Portland Circulation Improvements Southwest Neighborhoods, Inc., Central City Reconstruct Naito Pkwy with bicycle facilities, sidewalks, left turn pockets, and on-street parking. Remove Barbur tunnel, Ross Island ramps, Arthur/Kelly viaduct, and Grover ped bridge.  Coordinate with ODOT and the SW Corridor Plan. TBD Traffic/Freight
20119, 20120, 20121 Rose Quarter Interchange Improvements Central City Construct improvements to City of Portland transportation facilities in conjunction with the Rose Quarter Interchange project, including Clackamas Ped/Bike Bridge over I-5, surface street improvements, and lids over I-5. TBD Active
70013, 70014, 80009 SE Division St Bikeway Improvements East Portland Neighborhood Office, Southeast Uplift, Central City Construct enhanced bikeways. TBD Active
80015, 80032 Outer Powell Blvd Corridor Improvements East Portland Neighborhood Office Implement multi-modal safety and capacity improvements including sidewalks and enhanced bicycle facilities. TBD Active
90016, 90017 SW Corridor Access to Transit Southwest Neighborhoods, Inc., Central City Build high-priority access to transit improvements identified in SW Corridor Plan. TBD Active
90105, 90106 SW Corridor High Capacity Transit Southwest Neighborhoods, Inc., Central City Build high-capacity transit line in SW Corridor TBD Transit