Click to sort the table by: ID name description ward funding source cost rating
ID Name Description Ward Funding Source Cost Estimate Evaluation Rating Mode
A1 Buchanan Avenue/ 9th Street Turn Lane Intersection improvements (capacity): Construct eastbound left-turn lane, traffic signal modifications and improve sight distance for the eastbound approach. 5,6 City 1580000 Low Auto/Freight
A10 OR 99W/Goodnight Avenue Traffic Control Intersection improvements (capacity): Install roundabout or traffic signal, when warranted which may be dependent on the construction of Project A11. Improvement cannot occur until Project A48 is complete and should be coordinated with Project M126. Before a signal can be installed, an engineering investigation must be conducted or reviewed by the Region Traffic Engineer who will forward intersection traffic control recommendations to ODOT headquarters. Traffic signal warrants must be met and the State Traffic Engineer's approval obtained before a traffic signal can be installed on a state highway. 3 ODOT/Developer 8379000 Medium Auto/Freight
A11 OR 99W/Rivergreen Avenue Traffic Control Intersection improvements (capacity): Install roundabout or traffic signal, when warranted which may be dependent on the construction of Project A10. Before a signal can be installed, an engineering investigation must be conducted or reviewed by the Region Traffic Engineer who will forward intersection traffic control recommendations to ODOT headquarters. Traffic signal warrants must be met and the State Traffic Engineer's approval obtained before a traffic signal can be installed on a state highway.1 3 ODOT/Developer 8379000 Medium Auto/Freight
A12 Circle Boulevard/29th Street Signal Intersection improvements (capacity): Install traffic signal, when warranted. 7 City/Developer 465000 Low Auto/Freight
A13 OR 99W/Airport Avenue Traffic Control Intersection improvements (capacity): Install roundabout or traffic signal, when warranted. Before a signal can be installed, an engineering investigation must be conducted or reviewed by the Region Traffic Engineer who will forward intersection traffic control recommendations to ODOT headquarters. Traffic signal warrants must be met and the State Traffic Engineer's approval obtained before a traffic signal can be installed on a state highway.1 0 ODOT/Developer 5327000 Medium Auto/Freight
A14 OR 99W/Walnut Boulevard Intersection improvements (capacity): Could include construction of a northbound right turn lane, eastbound right turn lane, southbound right turn lane, westbound right turn lane and lengthening of the southbound left turn lane. Project is subject to ODOT approval. 6,9 ODOT 8380000 Medium Auto/Freight
A15 9th Street/Walnut Boulevard Turn Lanes Intersection improvements (capacity): Construct a southbound right turn lane and a second westbound left turn lane. 6,9 City 863000 Low Auto/Freight
A16 OR 99W/Kiger Island Drive Traffic Control Intersection improvements (capacity): Install roundabout or traffic signal, when warranted. Before a signal can be installed, an engineering investigation must be conducted or reviewed by the Region Traffic Engineer who will forward intersection traffic control recommendations to ODOT headquarters. Traffic signal warrants must be met and the State Traffic Engineer's approval obtained before a traffic signal can be installed on a state highway.1 0 ODOT/Developer 5327000 Medium Auto/Freight
A17 35th Street/US 20-OR 34 Intersection improvements (capacity and safety): Could include construction of a northbound right turn lane and traffic signal modifications for protected/permitted phases on 35th Street approaches. Consider coordination with Project A25. Project is subject to ODOT approval. 1,4 ODOT 232000 Medium Auto/Freight
A18 Technology Loop/US 20-OR 34 Intersection improvement (capacity): Could include constructing a second westbound left turn lane or traffic signal modifications for protected/permitted westbound left turn phase. Consider coordination with Project A25. Project is subject to ODOT approval. 1 ODOT 561000 Medium Auto/Freight
A2 Conifer Boulevard / Conser Street Turn Lane Intersection improvements (safety): Construct westbound left turn lane on Conifer Boulevard. 9 City 3679000 Low Auto/Freight
A20 Van Buren Avenue/9th Street Restripe Intersection improvements (safety): Restripe southbound approach to include on 9th Street a southbound left turn lane and southbound through lane includes signal timing modifications. Coordinate with Project B15. 2 City 26000 Medium Auto/Freight
A21 29th Street/Harrison Boulevard Turn Lane Intersection improvements (capacity): Construct a southbound right-turn lane. 4,5,7 City 222000 Low Auto/Freight
A24 3rd Street/OR 99W/Crystal Lake Drive/Avery Avenue Intersection improvements (capacity): Construct capacity improvements at the intersection. Improvements may include construction of a westbound right turn lane and a second southbound left turn lane, which would require a second receiving lane on Crystal Lake Drive, traffic signal modifications and installation of flexible bollards or other cost-efficient methods of increasing turning radius and slowing vehicles to improve pedestrian and bicycle safety. Project is subject to ODOT approval. 2,3 ODOT 2615000 Low Auto/Freight
A25 US 20-OR 34 Capacity Enhancements Capacity enhancements for the US 20-OR 34 corridor from OR 99W to the west UGB. Improvements could include: Widen US 20-OR 34 to 4-5 lanes, add turn lanes and traffic signal modifications. Consolidate and realign the US 20-OR 34/Western Boulevard intersections to form a single T-intersection including an eastbound left turn lane and southbound left turn lane or could also involve constructing a traffic signal or roundabout with bypass lanes and access management needed. Should be designed and constructed in coordination with Project A3 and P24. Project is subject to ODOT approval. Project has potential impacts to or may be constrained by environmental resources. 1,2,4 ODOT 37715000 High Auto/Freight
A26 9th Street/Harrison Boulevard Restripe Intersection improvements (safety): Restripe northbound approach to include a northbound left turn lane and northbound through lane includes signal timing modifications. Coordinate with Project B15. 2 City 26000 Medium Auto/Freight
A27 Kings Boulevard/Garfield Avenue Turn Lanes and Signal Intersection improvement (capacity and safety): Improve intersection sight distance, construct a northbound and southbound left turn lane and install a traffic signal, when warranted. Coordinate with Project A51. Project has potential impacts to or may be constrained by environmental resources. 6 City/Developer 741000 Medium Auto/Freight
A28 30th Street/Western Boulevard Traffic Control Intersection improvements (capacity): Install roundabout or traffic signal, when warranted or enhance alternative routes to encourage drivers to use signalized intersections at 35th Street or 26th Street. 4 City 5327000 Medium Auto/Freight
A29 OR 99W/Lewisburg Intersection improvements (capacity): Construct capacity improvements at the intersection. Improvements may include constructing an eastbound right turn lane, eastbound left turn lane, westbound right turn lane, westbound left turn lane, southbound right turn lane, traffic signal modifications and rail crossing enhancements. Project is subject to ODOT approval. 0 ODOT/Developer 2207000 Low Auto/Freight
A3 US 20-OR 34 Optimization Implement strategies identified in the US 20-OR 34 Optimization Study (2015): 1) Adaptive Signal Timing, 2) Freight Signal Priority, and/or 3) Arterial Performance Measurement and Real-Time Equipment Monitoring - at 5 signalized intersections and 1 mid-block locations to collect arterial performance measures, including traffic volumes, travel speeds, travel times, vehicle classifications, vehicle occupancy, pedestrian and bicycle volumes, and delay for vehicles, pedestrians and bicyclists. Consider need for coordination with Project A25. Project is subject to ODOT approval. Project has potential impacts to or may be constrained by environmental resources. 1,2,4 ODOT 910000 Medium Auto/Freight
A30 OR 99W/Lester Avenue Extension Signal Intersection improvements (capacity): Install roundabout or traffic signal, when warranted. Before a signal can be installed, an engineering investigation must be conducted or reviewed by the Region Traffic Engineer who will forward intersection traffic control recommendations to ODOT headquarters. Traffic signal warrants must be met and the State Traffic Engineer's approval obtained before a traffic signal can be installed on a state highway.1 0 ODOT/Developer 838000 Medium Auto/Freight
A31 Walnut Avenue/Highland Drive Turn Lanes Intersection improvements (capacity): Construct a southbound right turn lane, northbound right turn lane and a westbound right turn lane with signal timing updates to improve northbound and southbound left-turn movements. 6,8 City 1022000 Low Auto/Freight
A32 OR 99W/9th Street/Samaritan Drive/ Elks Drive Realignment Corridor (capacity and safety): Realignment of NW 9th Street at NW Elks Drive – NW 9th Street alignment will be shifted westward to align with NW Samaritan Drive as part of the Good Samaritan Regional Medical Center campus expansion. This improvement may also include widening of OR 99W from NE Conifer Boulevard to NW Elks Drive to provide four travel lanes. The Elks Drive/9th Street intersection may include a left-turn lane and shared through/right turn lane on each approach. The Elks Drive/OR 99W intersection may include two northbound through lanes, northbound left turn lane, two southbound through lanes, a southbound right turn lane, an eastbound right turn land and an eastbound left turn lane. Initial cost estimate includes new signals. Before a signal can be installed, an engineering investigation must be conducted or reviewed by the Region Traffic Engineer who will forward intersection traffic control recommendations to ODOT headquarters. Traffic signal warrants must be met and the State Traffic Engineer's approval.1 9 ODOT/Developer 9636000 Medium Auto/Freight
A33 OR 99W/Elliot Circle Intersection Improvements (capacity): May include the construction of roundabout or a traffic signal (when warranted), westbound left turn lane, westbound right turn lane, eastbound right turn lane and northbound left turn lane. The need for this project is dependent on Project M90. Before a signal can be installed, an engineering investigation must be conducted or reviewed by the Region Traffic Engineer who will forward intersection traffic control recommendations to ODOT headquarters. Traffic signal warrants must be met and the State Traffic Engineer's approval obtained before a traffic signal can be installed on a state highway.1 Project has potential impacts to or may be constrained by environmental resources. 0,1 ODOT/Developer 1810000 Low Auto/Freight
A35 Kings Boulevard Refinement Plan Corridor study to improve traffic (motor vehicle and freight) operations on Kings Boulevard with potential traffic control modifications. Project has potential impacts to or may be constrained by environmental resources. 5,6 City 150000 Medium Auto/Freight
A37 Lewisburg/West Elliot Circle Signal Intersection improvements (capacity): Install traffic signal, when warranted. Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 360000 Medium Auto/Freight
A38 Harrison Boulevard/4th Street Intersection improvements (capacity): May include construction of a southbound right turn lane on 4th Street and a westbound left turn lane on Harrison Boulevard (Consider changing westbound approach to include: a left turn lane, shared through/left turn lane, and through lane; or if needed: a left turn lane, shared through/left turn lane, and two through lanes). If a second westbound left turn lane is provided, pedestrian crossing safety on the south approach must be addressed. Project is subject to ODOT approval. Project has potential impacts to or may be constrained by environmental resources. 2 ODOT 485000 Low Auto/Freight
A39 Van Buren Avenue/2nd Street Turn Lane Intersection improvements (capacity): Consider converting the parking lane to an eastbound right turn lane on Van Buren Avenue. Decision to remove parking lane for a right turn lane must be coordinated with Project B21. Project is subject to ODOT approval. Project has potential impacts to or may be constrained by environmental resources. 2 ODOT 243000 Low Auto/Freight
A4 OR 99W/US 20-OR 34 Ramps New off-ramp: Provide eastbound off ramp between eastbound US 20-OR 34 to southbound OR 99W and provide a southbound off ramp between southbound OR 99W to eastbound US 20-OR 34. Project is subject to ODOT approval. Project has potential impacts to or may be constrained by environmental resources. 2 ODOT 24220000 Medium Auto/Freight
A41 Elliot Circle/Frazier Creek Roundabout Intersection improvements (capacity): Construct a roundabout, when needed. 0,1 County/Developer 2394000 Low Auto/Freight
A42 Highland Drive/Frazier Creek Roundabout Intersection improvements (capacity): Construct a roundabout, when needed. Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 5327000 Medium Auto/Freight
A43 Highland Drive/Lester Avenue Roundabout Intersection improvements (capacity): Construct a roundabout, when needed. Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 5327000 Medium Auto/Freight
A45 35th Street Turn Lanes Corridor (capacity): Construct left turn lanes along 35th Street between US 20-OR 34 and Harrison Boulevard at Western Boulevard, Washington Way, Jefferson Way, Campus Way, Orchard Avenue, Jackson Avenue, and Van Buren Avenue. Project has potential impacts to or may be constrained by environmental resources. 4 City/Developer
2109000 Low Auto/Freight
A46 OR 34 Overpass (OR 99W) Clearance Corridor (capacity): Improve to meet vertical clearance requirements. The vertical clearance for northbound and southbound OR 99W at the OR 34 overpass is one to two feet below the design standard. Project is subject to ODOT approval. Project has potential impacts to or may be constrained by environmental resources. 2 ODOT 63058000 Low Auto/Freight
A47 9th Street Signal Coordination Synchronize traffic lights along 9th Street between Polk Avenue and Elks Drive. Cost estimate includes signal controller upgrades and signal timing updates at six existing traffic signals: Polk Avenue, Buchanan Avenue, Grant Avenue, Garfield Avenue, Circle Boulevard, and Walnut Boulevard. 2,5,6,9 City 76000 Medium Auto/Freight
A48 Goodnight Avenue/3rd Street/OR 99W ROW Intersection improvement (capacity): ROW acquisition to allow realignment of Goodnight Avenue to make a 4-way intersection at Goodnight Avenue/OR 99W. Would precede Project A10. Project is subject to ODOT approval. 3 ODOT 370000 Medium Auto/Freight
A49 Seismic Retrofit of Bridges Program to support seismic retrofit of up to 12 bridges on collectors and arterials under City of Corvallis jurisdiction. Project has potential impacts to or may be constrained by environmental resources. NA City CostA49 Medium Auto/Freight
A5 OR 34/Bypass Interchange Intersection improvement (capacity): OR 34/Bypass Interchange Improvements. Suggested improvement- add westbound left-turn flyover ramp. Project is subject to ODOT approval. 0 ODOT 76632000 Low Auto/Freight
A51 Kings Boulevard Widening Widen to add a two-way left-turn lane between Circle Boulevard and Grant Avenue. Project has potential impacts to or may be constrained by environmental resources. 5,6 City 4040000 Medium Auto/Freight
A52 Kings Boulevard Widening Widen to add a two-way left-turn lane between Taylor Avenue and Harrison Boulevard. 5 City 11400000 Medium Auto/Freight
A53 Harrison Boulevard Improvements Corridor (capacity): Upgrade to arterial standards between 30th Street and 36th Street. Coordinate with Project B1. Project has potential impacts to or may be constrained by environmental resources. 4,7 City 3300000 Medium Auto/Freight
A54 Harrison Boulevard/3rd Street/OR 99W Improvements Intersection improvements (capacity and safety): Increase northeast corner turning radius for trucks. Project is subject to ODOT approval. Project has potential impacts to or may be constrained by environmental resources. 2 ODOT 109000 Medium Auto/Freight
A56 Circle Boulevard/OR 99W Improvements Intersection Improvements (capacity and safety): May include constructing a southbound right turn lane on OR 99W, northbound right turn lane on OR 99W, westbound right turn lane on Circle Boulevard, a second westbound left turn lane on Circle Boulevard and lengthening the westbound left turn lane; also may include traffic signal modifications to include right turn overlap on each approach and pedestrian improvements. Coordinate with Project PB29. Project is subject to ODOT approval. 6 ODOT 1846000 Medium Auto/Freight
A57 30th Street/Harrison Boulevard Improvements Intersection Improvements (capacity and safety): Options include 1) Restrict northbound left, northbound through movements, and restrict westbound to southbound off Harrison Boulevard, 2) Construct a traffic signal and coordinate with the traffic signal at 29th Street/Harrison Boulevard, or 3) Construct a series of roundabouts at 30th Street/Harrison Boulevard and 29th Street/Harrison Boulevard. Coordinate with Project A53. Initial costs represent Option 1 and Option 2. Widening Harrison Boulevard included in Project A53. 4,7 City 634000 Low Auto/Freight
A58 Van Buren Avenue/Kings Boulevard Realignment Intersection improvements (safety): May include closing the west approach of Van Buren Avenue to realign Kings Boulevard south approach and create a "T" intersection with Van Buren Avenue including bicycle and pedestrian improvements with traffic signal modifications. Project has potential impacts to or may be constrained by environmental resources. 5 City 667000 Medium Auto/Freight
A59 Reservoir Avenue/53rd Street Roundabout Intersections improvements (capacity and safety): Construct a roundabout. Project has potential impacts to or may be constrained by environmental resources. 1 County/Developer 5654000 Medium Auto/Freight
A6 Conifer Avenue/OR 99W/9th Street Intersections Intersection improvements (capacity and safety): Capacity improvements may include construction of a northbound right turn lane and southbound right turn lane on OR 99W, and closing the westbound approach at 9th Street/Conifer Boulevard to construct a second eastbound left turn lane. Closure of the westbound approach at 9th Street/Conifer may create a potential shift of traffic onto OR 99W, Walnut Boulevard, Elks Drive, and Kings Boulevard Extension, if constructed. Project is subject to ODOT approval. 9 ODOT 792000 Medium Auto/Freight
A60 Circle Boulevard Ext./Harrison Boulevard Improvements Intersections improvements (capacity and safety): Options include: 1) Construct a roundabout, or 2) Construct left turn lanes on the eastbound, southbound, and northbound approaches. Project has potential impacts to or may be constrained by environmental resources. 7 City/Developer
5629000 Medium Auto/Freight
A62 Witham Hill Drive/Circle Boulevard Traffic Control Intersections improvements (capacity and safety): Construct a roundabout or traffic signal. Project has potential impacts to or may be constrained by environmental resources. 7 City/Developer
2592000 Medium Auto/Freight
A63 Corliss Avenue/Weltzin Avenue Realignment Intersection improvements (safety): Realign intersection to create a 4-legged intersection. Initial cost assumes reconstruction of Weltzin Avenue between OR 99W and the railroad. NA City/Developer
4058000 Medium Auto/Freight
A64 53rd Street/US 20-OR 34 Intersection improvements (capacity and safety): May include constructing a southbound right turn lane, extending the westbound right turn lane, a second westbound through lane and a second eastbound through lane. This project should be coordinated with the 53rd Street and US 20-OR 34 corridor widening projects (M10 and A25). Additional coordination may be needed for the following pedestrian and bicycle projects: B8, P28, and PB59. Project is subject to ODOT approval. Project has potential impacts to or may be constrained by environmental resources. 1 ODOT 3162000 Medium Auto/Freight
A65 Elks Drive/OR 99W Traffic Control Intersection improvements (capacity): Install roundabout or traffic signal, when warranted. 9 ODOT 838000 Medium Auto/Freight
A66 Kings Boulevard/Buchanan Avenue Realignment Reconstruct the driveway on the west side of Kings Boulevard to align with Buchanan Avenue for a 4-legged, 90-degree intersection. Consider closing the other two driveways located north of Filmore to reduce conflicting traffic movements. 5 City 255000 Low Auto/Freight
A67 Frazier Creek Drive/Crescent Valley Drive Roundabout Intersection improvements (capacity): Construct a roundabout, when needed. Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 2394000 Medium Auto/Freight
A69 Satinwood Street Ext./Lester Avenue Ext. Roundabout Intersection improvements (capacity): Construct a roundabout, when needed. Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 2394000 Medium Auto/Freight
A7 OR 99W: Circle to RR Widening Widen OR 99W: Construct two additional travel lanes on OR 99W between the railroad over crossing and Circle Boulevard. Project is subject to ODOT approval. Project has potential impacts to or may be constrained by environmental resources. 6 ODOT 5250000 Medium Auto/Freight
A70 Crescent Valley Drive/Highland Drive Signal Intersection improvements (capacity): Install a roundabout or traffic signal, when warranted. Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 2394000 Medium Auto/Freight
A71 Circle Boulevard Signal Coordination Synchronize traffic lights along Circle Boulevard from 27th Street east to Walnut Boulevard. Cost estimate includes signal controller upgrades and signal timing updates at 8 existing traffic signals: 27th Street, Kings Boulevard, Corvallis Aquatic Center, Highland Drive, 9th Street, OR 99W, Four Acre Place, and Walnut Boulevard. 6,7,9 City 101000 Medium Auto/Freight
A72 Walnut Boulevard Signal Coordination Synchronize traffic lights along Walnut Boulevard between OR 99W and Glenridge Drive. Cost estimate includes signal controller upgrades and signal timing updates at 9 existing traffic signals: Glenridge Drive, Aspen Street, 29th Street, Kings Boulevard, Rolling Green Drive, Highland Drive, Satinwood Street, 9th Street, and OR 99W. 6,8,9 City 114000 Medium Auto/Freight
A8 Harrison Boulevard/2nd Street Intersections improvements (capacity and safety): May include extending the southbound right turn lane and constructing a westbound right turn lane. Coordinate with Project B31. Project is subject to ODOT approval. Project has potential impacts to or may be constrained by environmental resources. 2 ODOT 541000 Medium Auto/Freight
A9 53rd Street/Country Club Roundabout Intersection improvement (capacity): Construct a roundabout in conjunction with development. 1 County/Developer 2746000 Low Auto/Freight
M10 53rd Street Widening Widen to arterial standard between Harrison Boulevard and US 20-OR 34, consistent with the 5-lane cross-section identified in the West Corvallis - North Philomath Plan. Project has potential impacts to or may be constrained by environmental resources. 1 County/Developer 24954000 Medium Multimodal
M100 Corliss Avenue Widening Widen to neighborhood collector standard between OR 99W and East UGB. Coordinate with Project A63. Project has potential impacts to or may be constrained by environmental resources. 0 City/Developer
3818000 Medium Multimodal
M101 New N-S Neighborhood Collector between Airport Place and Rivergreen Avenue Extension New roadway expansion: Construct a new collector between Airport Place and Rivergreen Avenue Extension (M74). 3 City/Developer
21545000 Medium Multimodal
M102 25th Avenue/Park Terrace Place/Monroe Avenue Improvements Intersection improvements (capacity and safety): Consider restricting northbound and southbound approaches to right-in, right-out only to improve traffic operations and pedestrian/bicycle safety. Coordinate with Project PB16. 4,5 City 36000 Medium Multimodal
M104 Downtown Circulation Study Downtown Circulation Study to address a range of concerns and identify potential solutions expressed in the downtown area including: parking, motor vehicle circulation, bicycle connectivity, freight operations (loading), transit and pedestrian design. Also evaluate improvements at 3rd Street/OR 99W/OR 34 Ramp to address traffic operations/merge. Project is subject to ODOT approval. Project has potential impacts to or may be constrained by environmental resources. 2 City 150000 High Multimodal
M105 Washington Way Realignment New roadway extension: Realign Washington Way as the east leg of the existing Washington Avenue/15th Street intersection to form a 4-legged, 90-degree intersection. 4 City/OSU 1561000 Medium Multimodal
M106 Lester Avenue Modernization Upgrade Lester Avenue between Kings Boulevard Extension and Highland Drive to collector standard. Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 5849000 Medium Multimodal
M107 Crescent Valley Drive Modernization Upgrade Crescent Valley Drive between Lewisburg Drive and Highland Drive to collector standard. Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 16384000 Medium Multimodal
M108 Technology Loop Extension New roadway extension: Construct Technology Loop Extension to neighborhood collector standard between US 20-OR 34 and Gerold Street. Coordinate with A18. Project is subject to ODOT approval. Project has potential impacts to or may be constrained by environmental resources. 1 City/Developer
2356000 Medium Multimodal
M109 Sagebrush Drive Extension New roadway extension: Construct a new collector between 53rd Street and 35th Street to provide connection between Sagebrush Drive and Cherry Avenue. Project has potential impacts to or may be constrained by environmental resources. 4 City/OSU 14268000 Medium Multimodal
M11 Reservoir Avenue Extension New roadway extension: Extend Reservoir Avenue to connect with Washington Way and construct to collector standard Note: Construction is likely dependent on redevelopment. Project has potential impacts to or may be constrained by environmental resources. 4 City/OSU 7743000 Medium Multimodal
M110 Kiger Island Extension New roadway extension: Construct Kiger Island Extension to collector standard between OR 99W and west UGB. 3 County/Developer 13269000 Medium Multimodal
M111 Airport Avenue Extension New roadway extension: Construct Airport Avenue Extension to collector standard between OR 99W and New N-S Collector between Rivergreen Avenue and Airport Avenue Extension (M98). Coordinate with Project A13. 0 County/Developer 3193000 Medium Multimodal
M112 Gerold Street Extension New roadway extension: Construct Gerold Street Extension to neighborhood collector standard between West Hills Road and New E-W Collector between 35th Street and 53rd Street (M109). Project has potential impacts to or may be constrained by environmental resources. 0 City/OSU 4140000 Medium Multimodal
M113 New N-S Collector north of Lester Avenue Extension New roadway extension: Construct new collector between Lester Avenue Extension and New E-W Collector from Highland Drive to Lester Avenue Extension (M58). Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 4852000 Medium Multimodal
M114 Birdsong Drive Extension New roadway extension: Construct Birdsong Drive Extension to neighborhood collector standard between 49th Street and 53rd Street. 0 City/ Developer/ Assessments to property owners 3675000 Medium Multimodal
M116 Shasta Drive Extension New roadway extension: Construct Shasta Drive Extension to neighborhood collector standard between Frazier Creek Drive Extension to existing stub and construct frontage improvements on the existing portion of Shasta Drive. 0 County/Developer 3578000 Medium Multimodal
M117 Raider Way Extension New roadway extension: Construct Raider Way Extension to collector standard between Crescent Valley Drive and Kings Boulevard Extension and construct frontage improvements on the existing portion of Raider Way. Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 7509000 Medium Multimodal
M118 New E-W Neighborhood Collector between 53rd Street and 66th Street Extension New roadway extension: Construct E-W Neighborhood Collector between 53rd Street and 66th Street Extension. Project has potential impacts to or may be constrained by environmental resources. 1 City/Developer
9579000 Medium Multimodal
M119 New W-N Neighborhood Collector between 69th Street and West Hills Road New roadway extension: Construct W-N Neighborhood Collector between 69th Street and West Hills Road. Project has potential impacts to or may be constrained by environmental resources. 1 City/Developer
20284000 Medium Multimodal
M12 King Boulevard Extension New roadway extension: Extend Kings Boulevard from current stub north to Crescent Valley Drive and construct to arterial standard. Project has potential impacts to or may be constrained by environmental resources. 8 City/Developer
36799000 Medium Multimodal
M120 66th Street Extension New roadway extension: Construct 66th Street Extension to neighborhood collector standard between existing stub and West Hills Road and construct frontage improvements on the existing portion of 66th Street. Project has potential impacts to or may be constrained by environmental resources. 0 City/Developer
8719000 Medium Multimodal
M121 New N-S Neighborhood Collector between US 20-OR 34 and West Hills Road New roadway extension: Construct N-S Neighborhood Collector between US 20-OR 34 and West Hills Road. Project is subject to ODOT approval. Project has potential impacts to or may be constrained by environmental resources. 1 City/Developer
9579000 Medium Multimodal
M122 New N-S Neighborhood Collector between Country Club Drive and Plymouth Drive New roadway extension: Construct N-S Neighborhood Collector between Country Club Drive and Plymouth Drive. 1 City/Developer
7607000 Medium Multimodal
M123 Weltzin Avenue Extension New roadway extension: Construct Weltzin Avenue Extension to collector standard between OR 99W and West UGB including upgrading the existing gravel portion. Weltzin Avenue Extension should align with Corliss Avenue Extension (M100) at OR 99W to form a 4-legged, 90-degree intersection. 0 City/Developer
11833000 Medium Multimodal
M124 New E-W Neighborhood Collector between Technology Loop Extension and 53rd Avenue New roadway extension: Construct new neighborhood collector between Technology Loop Extension and 53rd Avenue. 1 City/Developer
3099000 Medium Multimodal
M125 New N-S Collector between Reservoir Avenue and Walnut Boulevard New roadway extension: Construct new neighborhood collector between Reservoir Avenue and Walnut Boulevard. Project has potential impacts to or may be constrained by environmental resources. 1 City/Developer
24228000 Medium Multimodal
M126 Goodnight Avenue Realignment Corridor (capacity and safety): Realign Goodnight Avenue west of OR 99W form a 4-legged, 90-degree intersection at OR 99W/Goodnight Avenue (east of OR 99W). This realignment will impact properties west of OR 99W. Coordinate with Project A10 and Project PB49. 3 City/Developer
3068000 Medium Multimodal
M127 New E-W Neighborhood Collector between Elliot Circle and East UGB New roadway extension: Construct new neighborhood collector between Elliot Circle and East UGB (south of Pinot Gris Drive). 0 City/Developer
7043000 Medium Multimodal
M128 53rd Street Modernization Upgrade 53rd Street between Country Club Drive and Nash Avenue to arterial standard. 1 County 5954000 Medium Multimodal
M129 Crystal Lake Drive Modernization Upgrade Crystal Lake Drive between Alexander Avenue and Park Avenue to neighborhood collector standard. 3 City/ Developer/ Assessments to property owners 5516000 Medium Multimodal
M13 Highland Drive Widening Widen Highland Drive between Angelica Drive and Lewisburg Road to meet arterial standard. Coordinate with Project PB60. Project has potential impacts to or may be constrained by environmental resources. 8,9 County/Developer 16949000 Medium Multimodal
M130 Oak Creek Drive Modernization Upgrade Oak Creek Drive between Walnut Boulevard and West UGB to collector standard. Project has potential impacts to or may be constrained by environmental resources. 0 City/Developer
2100000 Medium Multimodal
M14 Lewisburg Avenue Widening Widen Lewisburg Avenue between OR 99W and west UGB to meet arterial standard. Coordinate with Project PB61. Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 15390000 Medium Multimodal
M15 Crystal Lake Drive Extension New roadway extension: Extend Crystal Lake from Park Avenue to Goodnight Avenue and construct to neighborhood collector standard. 3 County/Developer 2358000 Medium Multimodal
M16 53rd Street Railroad Crossing Intersection improvements (capacity and safety): Reconstruct crossing including right-of-way acquisition and also consider realignment. Coordinate with Project M10. Project has potential impacts to or may be constrained by environmental resources. 1 County 7000000 Medium Multimodal
M2 26th Street/US 20-OR 34 Improvements Intersection improvements (capacity): May include constructing a southbound right turn lane or southbound left turn lane and bike lanes on 26th Street. Note: Retaining wall along Oak Creek would be required. Project is subject to ODOT approval. Project has potential impacts to or may be constrained by environmental resources. 1,4 ODOT 1280000 Medium Multimodal
M20 North Corvallis Bypass New roadway extension: Construct the 2-lane northern leg of the OR 34 bypass from the existing OR 34/OR 34 Bypass intersection across the Willamette River connecting to US 20 and OR 99W north of Polk Avenue. Coordinate with Project M8. Note: Right-of-Way acquisition needed. Project is subject to ODOT approval. Project has potential impacts to or may be constrained by environmental resources. 6 ODOT 148337000 Medium Multimodal
M23 Walnut Boulevard/Witham Hill Drive/Glenridge Drive Intersection improvements (safety): Extend the westbound merge on Walnut Boulevard. Project has potential impacts to or may be constrained by environmental resources. 8 City 280000 Medium Multimodal
M24 Western Boulevard/7th Street Rail Crossing Improvements Intersection improvements (safety): Improvements needed to mitigate complex intersection and minimize multimodal conflicts. Improvements should focus on multimodal safety and pedestrian circulation around 7th Street rail crossings. Note: To be constructed with development. Project has potential impacts to or may be constrained by environmental resources. 2 Developer 479000 Medium Multimodal
M27 Country Club Drive/69th Street/US 20-OR 34 Intersection Improvements (safety): Improvements needed to mitigate complex intersection and poor street alignments. Improvements may include realignments of Country Club Drive and 69th Street and may include a roundabout. Project is subject to ODOT approval. 1 ODOT 5679000 Low Multimodal
M29 Harrison Boulevard/Kings Boulevard Intersection improvements (safety): Improve way finding signage. 5 City 10000 Medium Multimodal
M3 West Hills Road Modernization Widen to arterial standard between Western Boulevard and Reservoir Avenue. Consider supplemental safety improvements to address potential sight distance limitations related to horizontal and vertical alignment (west of Grand Oaks). Project has potential impacts to or may be constrained by environmental resources. 1 County/Developer 18888000 High Multimodal
M30 Grant Ave/29th Street Intersection improvements (capacity and safety): Options include: 1) Close Coolidge Way at the intersection of Grant Avenue/29th Street and connection to Grant Avenue just east of the intersection. Create a public plaza and construct curb extensions to shorten the crossing distance, or 2) Install a traffic signal. Note: Initial costs assumes a traffic signal. Project has potential impacts to or may be constrained by environmental resources. 5,7 City 599000 Medium Multimodal
M4 Ponderosa Avenue Modernization Widen to collector standard. Project has potential impacts to or may be constrained by environmental resources. 8 City/Developer 5485000 Medium Multimodal
M47 15th Street/US 20-OR 34 Intersection improvements (capacity and safety): May include constructing a southbound left turn lane which would require reconstruction of the southwest corner to align the southbound through lane and its receiving lane, traffic signal modifications to include protected northbound and southbound left-turns, reduce turning radii to reduce speed and installing freight sensors to allow freight to pass through without braking to reduce noise pollution and adding bike box to improve safety. Consider modifying grading to improve visibility. Project is subject to ODOT approval. 2,4 ODOT 1600000 High Multimodal
M49 Van Buren Avenue/4th Street Intersection improvements (capacity and safety): May include extending the eastbound right turn lane, removal of parking to construct a southbound left turn lane, or removal of parking to construct curb extensions. Initial costs include the eastbound right turn and southbound left turn lane improvements. Project is subject to ODOT approval. 2 ODOT 121000 Medium Multimodal
M5 Circle Boulevard/ 9th Street Improvements Intersection improvements (capacity and safety): May include constructing a northbound right turn lane, southbound right turn lane and westbound right turn lane with signal modifications (northbound right turn and southbound right turn overlap), lengthen the northbound left turn lane, and pedestrian/bicycle improvements. Requires ROW acquisition. Coordinate with Project B27. 6,9 City 1156000 Medium Multimodal
M58 New E-W Collector from Highland Drive to Lester Avenue Extension New roadway extension: Construct new collector between Highland Drive and Lester Avenue Extension. Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 10559000 Medium Multimodal
M59 Circle Boulevard Extension New roadway extension: Extend Circle Boulevard between Harrison Boulevard and New E-W Collector from Reservoir Avenue to Washington Way and construct to neighborhood collector standard. Note: Construction is likely dependent on redevelopment. Project has potential impacts to or may be constrained by environmental resources. 0 OSU 7209000 Medium Multimodal
M6 Circle Boulevard Extension to Harrison Boulevard New roadway extension: Construct Circle Boulevard Extension to arterial standard between existing stub and Harrison Boulevard. Project has potential impacts to or may be constrained by environmental resources. 7 City/Developer 8569000 Medium Multimodal
M60 Western Boulevard Improvements Corridor (capacity and safety): Construct a center turn lane on Western Boulevard between 4th Street and 26th Street and construct high visibility crosswalks along this segment. Note: Initial cost assumes up to 5 high visibility crosswalks along this segment and the specific locations have not been identified. Coordinate with Project A28 and Project M24. Project has potential impacts to or may be constrained by environmental resources. 2,4 City 5393000 Medium Multimodal
M61 Arnold Way Improvements Intersection improvements (safety): Safety improvements to reduce auto/bicycle/pedestrian conflicts and reduce speeding include: 1) Realign Van Buren Avenue, west of Arnold Way and to intersect Arnold Way to form a T-intersection and close 28th Street at the intersection of 28th Street/Arnold Way and 2) Realign Jackson Avenue to intersect Arnold Way to form a T-intersection and close 27th Street at the intersection of 27th Street/Arnold Way. 4 City 1306000 Low Multimodal
M64 29th Street Extension New roadway extension: Construct 29th Street Extension to collector standard between existing stub and Kings Boulevard Extension. Project has potential impacts to or may be constrained by environmental resources. 8 City/Developer
4281000 Medium Multimodal
M7 New N-S Neighborhood Collector from Airport Avenue to Goodnight Avenue New roadway extension: Construct new neighborhood collector connecting Airport Avenue to Goodnight Avenue west of OR 99W. Project has potential impacts to or may be constrained by environmental resources. 3 City/Developer 9681000 Medium Multimodal
M71 Satinwood Street Extension New roadway extension: Construct Satinwood Street Extension to collector standard between existing stub and Lester Avenue Extension. Project has potential impacts to or may be constrained by environmental resources. 9 City/Developer
5280000 Medium Multimodal
M74 Rivergreen Avenue Extension New roadway extension: Construct Rivergreen Avenue Extension to neighborhood collector standard between OR 99W and new Collector between Airport Place and Rivergreen Avenue Extension (M101). Project has potential impacts to or may be constrained by environmental resources. 3 City/Developer
8763000 Medium Multimodal
M77 Lester Avenue Extension New roadway extension: Construct Lester Avenue Extension to collector standard between Highland Drive and OR 99W. Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 13127000 Medium Multimodal
M78 Frazier Creek Drive Extension New roadway extension: Construct Frazier Creek Drive Extension to collector standards between Crescent Valley Drive and West Elliot Circle Extension. Coordinate with Project PB70. Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 21830000 Medium Multimodal
M79 New N-S Collector parallel to, and east of, Highland Drive New roadway extension: Construct a new N-S roadway parallel to, and east of, Highland Drive to collector standard between Frazier Creek Extension and new E-W Collector from Highland Drive to Lester Avenue Extension (M58). Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 13007000 Medium Multimodal
M8 Van Buren Bridge (New Construction) Reconstruct a new two-lane bridge across the Willamette River adjacent to and north of the Van Buren Avenue Bridge. Address weight restriction and vertical clearance on Van Buren Bridge to avoid out-of-direction travel for trucks. Project is subject to ODOT approval. Project has potential impacts to or may be constrained by environmental resources. 0 ODOT 69000000 High Multimodal
M9 Harrison Boulevard Widening Widen Harrison Boulevard between 36th Street and 53rd Street to 3-lanes to meet arterial standard including bike lanes. Coordinate with Project P27 and Parks Master Plan project. Project has potential impacts to or may be constrained by environmental resources. 4,7 County/Developer 9200000 Medium Multimodal
M90 West Elliot Circle Construction New roadway extension: Construct West Elliot Circle to collector standard between OR 99W and the north UGB. Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 19262000 Medium Multimodal
M91 New N-S Neighborhood Collector between Lewisburg Avenue and Frazier Creek Drive Extension New roadway extension: Construct new neighborhood collector between Lewisburg Avenue and Frazier Creek Drive Extension. Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 6985000 Medium Multimodal
M92 New N-S Neighborhood Collector between Crescent Valley Drive and Spring Meadow Drive New roadway extension: Construct new neighborhood collector between Crescent Valley Drive and Spring Meadow Drive. Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 7373000 Medium Multimodal
M93 Spring Meadow Drive Extension New roadway extension: Construct Spring Meadow Drive Extension to neighborhood collector standard between Highland Drive and exiting stub. Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 6209000 Medium Multimodal
M94 New N-S Neighborhood Collector between Lewisburg Drive and Spring Meadow Drive Extension New roadway extension: Construct new neighborhood collector between Lewisburg Drive and Spring Meadow Drive Extension. Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 3881000 Medium Multimodal
M95 New N-S Neighborhood Collector between Lester Avenue and Crescent Valley Drive New roadway extension: Construct new neighborhood collector between Lester Avenue and Crescent Valley Drive. Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 7502000 Medium Multimodal
M98 New N-S Collector between Rivergreen Avenue and Airport Avenue Extension New roadway extension: Construct new collector between Rivergreen Avenue and Airport Avenue Extension. 3 City/Developer
23348000 Medium Multimodal
M99 Herbert Avenue Extension New roadway extension: Construct Herbert Avenue Extension to collector standard between OR 99W and East UGB. Project has potential impacts to or may be constrained by environmental resources. 0 County/Developer 5937000 Medium Multimodal